Mission UPSC
DashboardCurrent AffairsPYQ HubInsightsNewSyllabusMock Tests
Log in
Mission UPSC

Your complete UPSC preparation companion. Practice PYQs, take mock tests, and stay updated with current affairs.

Study Resources

  • Previous Year Questions
  • UPSC Syllabus
  • Mock Tests

Current Affairs

  • Daily Updates
  • Monthly Compilations

Company

  • Privacy Policy
  • Terms of Service
  • Contact Us
© 2026 Mission UPSC. All rights reserved.
Back to Current Affairs
🌱 Environment•26 July 2026

Tribal Protests Intensify Over Ken-Betwa River-Linking Project

Context: Villagers, mostly tribal, protesting the ₹44,000-crore Ken-Betwa Link Project in Madhya Pradesh were forcibly cleared by police after an 18-day hunger strike, with disputes over rehabilitation packages, consent processes, and large-scale tree felling inside the Panna Tiger Reserve. The project is the first of India's proposed river-interlinking schemes under the National Perspective Plan.

2 min read

Tribal Protests Intensify Over Ken-Betwa River-Linking Project

Context

Police cleared a protest site in Chhatarpur district, Madhya Pradesh, where tribal villagers had demonstrated for two weeks against the Ken-Betwa Link Project and two state irrigation projects, alleging inadequate rehabilitation and flawed consent processes.

Key Facts

  • The Ken-Betwa Link Project is India's first river-interlinking project, part of the National Perspective Plan (1980) covering 30 proposed links nationwide.
  • It involves building the Daudhan Dam on the Ken river and a 221-km canal (including a 2-km tunnel) to transfer water to the Betwa, aiming to supply drinking water to 4.4 million people in Madhya Pradesh and 2 million in Uttar Pradesh.
  • 7,193 families across 22 villages in Chhatarpur and Panna districts face displacement; protesters demand individual (not family-based) rehabilitation packages of ₹12.5 lakh.
  • Roughly 17,101 trees were identified for felling inside the Panna Tiger Reserve, with over 12,400 already felled, threatening the reserve's tiger reintroduction programme and species like gharials and vultures.
  • The Centre has withheld hydrological data of the Ken-Betwa basins, citing sensitivity as part of the international Ganga basin.
  • Significance for UPSC

    Key GS3 topic on river interlinking, environmental clearances, and displacement/rehabilitation policy; also touches GS2 (federalism, gram sabha consent under PESA/Forest Rights Act) and GS1 (tribal welfare).

    Related Topics

    National Perspective Plan and river interlinking; Panna Tiger Reserve and Project Tiger; Forest Rights Act, 2006 and gram sabha consent; Rehabilitation and Resettlement policy; Environmental Impact Assessment for large infrastructure projects.

    Quick Quiz

    Test your understanding

    0/1

    Q1.The Ken-Betwa Link Project involves constructing which dam as its key infrastructure component?

    ken-betwa-linkriver-interlinkingrehabilitationpanna-tiger-reservedisplacement